1.Environmental Quality Act (EQA) 1974 was enacted to prevent, abate, control
pollution and enhance the quality of environment. The Department of Environment
administer and enforce the EQA 1974, and Section IV of the Economic Exclusive
Zone Act 1984.
2.Inspection and enforcement visits are being carried out to industrial premises to
ensure that industrial sectors comply with the Environmental Quality Act 1974:
3.Road side inspections on motor vehicles are conducted;
*Approved Facilities
*List of Aprroved Facilities
4.Aerial and ground surveillance on pollution sources are being carried out;
5.Air quality in the country is monitored for 24 hours to detect any changes in the
ambient air quality status that may cause harm to human health and the environment;
#Air Quality Monitoring
#Recommended Malaysian Air Quality Guidelines
#Air Pollutant Monitored
#Air Pollutant Index (API)
#Calculation of API (Flow Chart)
#Pollutant Measurement Technique
6.Awareness programme are conducted to educate public on the need to protect the
environment;
7.Initiate and promote research collaborations on relevant environmental area;
8.Participate in international negotiations on relevant environmental issues
Approved Facility
PROGRAMME FOR THE ESTABLISHMENT OF APPROVED FACILITY' FOR TESTING EMISSIONS FROM MOTOR VEHICLES
'APPROVED FACILITY' means a facility or place approved by the Director General which is equipped with the necessary smokemeter and/or gaseous meter and trained personnel for carrying out any smoke and gaseous emission test from motor vehicles.
PURPOSE
The purpose of establishing the 'Approved Facility' are as follows :-
i) To prepare testing facilities to enable the vehicle owners/drivers to send their vehicles (petrol or diesel) for testing their exhant emission (at their own cost).This would assist the vehicles owners / drivers to observe the level of their vehicle emission and its compliance to the environmental laws.
ii)To enable corrective action be immediately taken on the vehicle engines to stop emitting excessive smoke/gaseous (to stop pollution the environment)
LAW AND EMISSION LIMITS FOR MOTOR VEHICLES.
Diesel :Environmental Quality (Control of Emission from diesel engine) Regulation, 1996
Vehicles enforced since September 1996.
Limit for Black Smoke : 50 Hartridge Smoke Unit ( HSU ) or 50 % opacity .
Emission
Petrol : Environment Quality (Control of Emission from Petrol Engine) Regulation, 1996.
Vehicles enforced since September 1996.
Limit for Gaseous : Vehicles of New Model
Emiission ( introduced after 1-1-1997 )
CO = 3.5 % ; HC = 600 ppm.
: Vehicles of Existing Model
( introduced before 1-1-1997 )
Co = 4.5 % ; HC = 800 ppm.
WHO SHOULD APPLY
1.Person/Company who own/operate:
i). Motor Vehicle Test Centre
ii). Motor Vehicle Service Centre
iii). Service Station ( Petrol Kiosks )
iv). Motor Vehicle Workshop
CRITERIA FOR OBTAINING RECOGNITION AS AN 'APPROVED FACILITY'
Motor Vehicle Test Centre / Service Centre/ Service Station / workshop that is equipped with:-
1. Smokemeter and/or CO & HC Analyzer.
2. Trained personnel prossessing the Certificate of Competency from Department of
Environment (DOE).
(DOE will conduct training and issue the Certificate of Competency to trainees which have undergone the DOE training).
(Training is given upon applications)
ISSUANCE OF THE 'APPROVED FACILITY' CERTIFICATE
'APPROVED FACILITY' Certificate would be issued to the applications by DOE as a recognition to facilities which fulfil the stipulated criteria.
HOW TO APPLY
1. Applicants need to fill the JAS/KYDL/01 Form obtainable at:-
i) /doe/KYDL/borangKYDL.pdf
ii) Department of Environment
Ministry of Natural Resources and Environment
Level 1-4, Podium 2 & 3, Lot 4G3, Presint 4
Federal Government Administrative Centre
62574 PUTRAJAYA
iii) The States Department of Environment Offices.
2. Returned the above Form to any of the DOE offices as above
NO CHARGE OR FEES WILL BE IMPOSED IN THE PROCESSING OF THE ABOVE ' APPROVED FACILITY'
BENEFITS OBTAINED BY THE APPLICANTS
Your Motor Vehicle Test Centre / Service Station / Workshop would be ' upgraded and recognized as an APPROVED FACILITY' for conducting exhant test from motor vehicles by the Department Of Environment Malaysia.
Department of Environment only recognizes vehicular emission test conducted by 'APPROVED FACILITY' in enforcing the environmental laws and regulations.
Showing posts with label azhana. Show all posts
Showing posts with label azhana. Show all posts
Sunday, September 30, 2007
Environmental Impact Assessment
What is Environmental Impact Assessment?
The aim of the environmental impact assessment is to assess the overall impact on the environment of development projects proposed by the public and private sectors. The objectives of environmental impact assessment are:
1.To examine and select the best from the project options available;
2.To identify and incorporate into the project plan appropriate abatement and
mitigating measures;
3.To predict significant residual environmental impacts;
4.To determine the significant residual environmental impacts predicted; and
5.To identify the environmental costs and benefits of the project to the community.
Why do we need EIA?
EIA is essentially a planning tool for preventing environmental problems due to an action. It seeks to avoid costly mistakes in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modifications that may be required subsequently in order to make the action environmentally acceptable. In Malaysia, EIA is required under section 34A, Environmental Quality Act, 1974.
How to conduct EIA?
To assist you in the preparation of environmental impact assessment reports, you may refer to "A Handbook of Environmental Impact Assessment Guidelines" and EIA guidelines for specific activities published by the Department of Environment.
What are the EIA procedures?
The EIA procedure adopted in Malaysia consists of three major steps. The steps in the EIA procedure are as follows:
1.Preliminary assessment of all prescribed activities;
2.Detailed assessment of those prescribed activities for which significant residual
environmental impacts have been predicted in the preliminary assessment;
3.Review of assessment reports;
What are the steps of the EIA?
Preliminary Assessment
The objectives of Preliminary Assessment for prescribed activities are:
~to examine and select the best from the project options available.
~to identify and incorporate into the project plan appropriate abatement and mitigating
measures.
~to identify significant residual environmental impacts.
A Preliminary Assessment should normally be initiated during the early stages of project planning. Standard Procedural Steps are provided and the assessment might be conducted "in house", or by a consultant. Some form of public participation is mandatory. Environmental data collection may be necessary and close liaison between the assessor and relevant environment related agencies is encouraged. The results of Preliminary Assessment are reported formally for examination and approval by the project approving authority and the Director General of Environmental Quality. Preliminary Assessment requires resources that are a small proportion of the man-hours, money, skills and equipment committed to a pre-feasibility study and the assessment should be completed within the time frame of that study.
Detailed Assessment
The objectives of Detailed Assessment for prescribed activities with potentially significant residual environmental impact include :
1.to describe the significant residual environmental impacts predicted from the final project
plan;
2.to specify mitigating and abatement measures in the final project plan; and
3.to identify the environmental costs and benefits of the project to the community.
Detailed Assessment should continue during project planning until the project plan is finalised. Standard procedural steps are provided and specific terms of reference based on the results of Preliminary Assessment are issued for each project. The Assessment might be conducted "in house" or by a consultant. The assessment method is selected according to the nature of the project; some form of public participation is required. Environmental data collection is almost certainly necessary. The results of Detailed Assessment is reported formally.
The EIA Review Process
The objectives of Review for Prescribed Activities subjected to Detailed Assessment include:
1. to critically review the Detailed Assessment reports;
2. to evaluate development and environmental costs and benefits of the final project plan; and
3. to formulate recommendations and guidelines to the project approving authority relevant to the implementation of the project.
Review of EIA Reports is carried out internally by the DOE with the assistance from the relevant technical agencies for preliminary assessment reports and by an ad hoc Review Panel for detailed assessment reports. Recommendations arising out of the review are transmitted to the relevant project approving authorities for consideration in making a decision on the project. According to the DOE's Client Charter, the period allocated for a review of a term of reference (TOR) and EIA report are as follows:
Preliminary EIA Report - 5 weeks
Terms of Reference (TOR) for the preparation of Detailed EIA Report - 4 weeks
Detailed EIA Report - 12 weeks
The DOE maintains a list of experts who may be called upon to sit as members of any Review Panel established. The selection of the experts depends on the areas of environmental impacts to be reviewed.
Last Updated ( Friday, 17 August 2007 )
The aim of the environmental impact assessment is to assess the overall impact on the environment of development projects proposed by the public and private sectors. The objectives of environmental impact assessment are:
1.To examine and select the best from the project options available;
2.To identify and incorporate into the project plan appropriate abatement and
mitigating measures;
3.To predict significant residual environmental impacts;
4.To determine the significant residual environmental impacts predicted; and
5.To identify the environmental costs and benefits of the project to the community.
Why do we need EIA?
EIA is essentially a planning tool for preventing environmental problems due to an action. It seeks to avoid costly mistakes in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modifications that may be required subsequently in order to make the action environmentally acceptable. In Malaysia, EIA is required under section 34A, Environmental Quality Act, 1974.
How to conduct EIA?
To assist you in the preparation of environmental impact assessment reports, you may refer to "A Handbook of Environmental Impact Assessment Guidelines" and EIA guidelines for specific activities published by the Department of Environment.
What are the EIA procedures?
The EIA procedure adopted in Malaysia consists of three major steps. The steps in the EIA procedure are as follows:
1.Preliminary assessment of all prescribed activities;
2.Detailed assessment of those prescribed activities for which significant residual
environmental impacts have been predicted in the preliminary assessment;
3.Review of assessment reports;
What are the steps of the EIA?
Preliminary Assessment
The objectives of Preliminary Assessment for prescribed activities are:
~to examine and select the best from the project options available.
~to identify and incorporate into the project plan appropriate abatement and mitigating
measures.
~to identify significant residual environmental impacts.
A Preliminary Assessment should normally be initiated during the early stages of project planning. Standard Procedural Steps are provided and the assessment might be conducted "in house", or by a consultant. Some form of public participation is mandatory. Environmental data collection may be necessary and close liaison between the assessor and relevant environment related agencies is encouraged. The results of Preliminary Assessment are reported formally for examination and approval by the project approving authority and the Director General of Environmental Quality. Preliminary Assessment requires resources that are a small proportion of the man-hours, money, skills and equipment committed to a pre-feasibility study and the assessment should be completed within the time frame of that study.
Detailed Assessment
The objectives of Detailed Assessment for prescribed activities with potentially significant residual environmental impact include :
1.to describe the significant residual environmental impacts predicted from the final project
plan;
2.to specify mitigating and abatement measures in the final project plan; and
3.to identify the environmental costs and benefits of the project to the community.
Detailed Assessment should continue during project planning until the project plan is finalised. Standard procedural steps are provided and specific terms of reference based on the results of Preliminary Assessment are issued for each project. The Assessment might be conducted "in house" or by a consultant. The assessment method is selected according to the nature of the project; some form of public participation is required. Environmental data collection is almost certainly necessary. The results of Detailed Assessment is reported formally.
The EIA Review Process
The objectives of Review for Prescribed Activities subjected to Detailed Assessment include:
1. to critically review the Detailed Assessment reports;
2. to evaluate development and environmental costs and benefits of the final project plan; and
3. to formulate recommendations and guidelines to the project approving authority relevant to the implementation of the project.
Review of EIA Reports is carried out internally by the DOE with the assistance from the relevant technical agencies for preliminary assessment reports and by an ad hoc Review Panel for detailed assessment reports. Recommendations arising out of the review are transmitted to the relevant project approving authorities for consideration in making a decision on the project. According to the DOE's Client Charter, the period allocated for a review of a term of reference (TOR) and EIA report are as follows:
Preliminary EIA Report - 5 weeks
Terms of Reference (TOR) for the preparation of Detailed EIA Report - 4 weeks
Detailed EIA Report - 12 weeks
The DOE maintains a list of experts who may be called upon to sit as members of any Review Panel established. The selection of the experts depends on the areas of environmental impacts to be reviewed.
Last Updated ( Friday, 17 August 2007 )